Shower Door Refurbishment Homerton College | Case Study

Office partitioningquick, simple and cost-effective way to divide workspace

30+ Years Of ExperienceWe've been helping people for over 30 years

100% Guaranteed QualityAll work is guaranteed to ensure quality

New College Showers – Homerton College

We were approached by the Facilities Manager of Homerton College with the job of updating 240 number shower doors within the Halls of Residence over a three-year period. The first 80 were installed in July 2010, with a further 80 fitted in 2011 and the final 80 in 2012.

Details

  • Company: Homerton College
  • Location: Halls of Residence – Cambridge CB2
  • Project Type: 80 Shower Doors
  • Value: £70,800

Scope of Works

  • Removal of old shower doors
  • Clearance from site
  • Installation of 80 new Formica faced shower doors

End result

We had to carry out these works with the least disruption to the college timetable possible. Therefore, it was agreed these works would take place during non-term time. However, the Halls of Residence are frequently hired out throughout non-term time, so we had to liaise carefully with the Facilities Manager to make sure that we did not interrupt their functions.

Obviously, it was essential that all building and health & safety requirements were adhered to and we supplied only first-class tradesmen to carry out all the elements of this project. Due to the college annual budget allocation, these works were spread over three years.

Do you have a commercial premises that needs refurbishment? Get in touch with us today to get started with a refresh.

School Refurbishment Call us

©GDL Interiors

Website by Unity Online